This week I was able to make good progress on the braking system. I spent about 20 hours in the machine shop making my design. Unfortunately, I made a mistake on two parts so I had to start over. Parts finished are shown and listed below. I am currently prepping to have my design welded as well.


-8 side pieces.
-2 Mounting brackets
-2 Bottom sliders
-1 Top slider
-1 Shaft
-1 Top slider
-1 Electromagnet holder

Needed:

-1 Top slider
-1 Shaft
-1 Electromagnet holder
-Welding