Week of 03-20-2019 to 03-27-2019

This week I was able to finalize my design and make engineering drawings. Engineering drawings are complete for all the parts of the design. I will be taking these drawings to the makerspace area where the lathe and mill is located. I will be using the drawings to make my parts.



Comments

Popular posts from this blog

Final Week

Week of 04-17-2019 to 04-24-2019

Week of 04-24-2019 to 05-1-2019