Week of 02-20-2019 to 02-27-2019

This week, I was able to completely redesign my braking system. I made some small changes which will help during the manufacturing stage. All the fabrication, manufacturing, and assembly will be done my myself. I am currently in contact with the central shop with several questions about equipment. As soon as I hear back from them, I will purchase all my metal stock needed. I plan to finish manufacturing my design by the end of March.



Comments

Popular posts from this blog

Final Week

Week of 04-24-2019 to 05-1-2019

Week of 05-01-2019 to 05-8-2019