Week of 10-31-2018 to 11-07-2018

Emergency Brakes:

For this week, I ran FEA on the armature assembly to make sure that It can withstand forces that that will be present. A force of 1500lbf was applied to the bottom of the armature which simulates the pulling force of the electromagnet. The minimum factor is 2.8 which is acceptable. Furthermore, the Von-Mises effective stress is below the yield strength of the material which is also good. I will continue to run FEA on other parts as well.